Details for Upper Mississippi Lock 22 and 25 Concept Study
PropertyValue
NameUpper Mississippi Lock 22 and 25 Concept Study
Description

Tetra Tech INCA completed this concept study in 2005 for the Rock Island District, which followed work previously performed in 2000 to design 118-foot long post-tensioned concrete box beams for new lower guide walls on the Upper Mississippi River. Both design efforts required close coordination with Rock Island and St. Louis Districts.

INCA prepared design criteria, developed lock concepts, evaluated the new lock alternatives, prepared preliminary construction schedules (including considerations of required closures of the existing lock), and completed quantity take-off and planning level cost estimates. INCA recommended a lift-in precast concrete alternative for the new lock wall designs, and this general concept was selected as the basis for future design phases. In performance evaluations for this task order, INCA received an overall rating of Excellent and our design services were rated at Outstanding in all categories.

FilenameLock and Dam 22 and 25 Concept Study.pdf
Filesize108 kB
Filetypepdf (Mime Type: application/pdf)
CreatorINCA
Created On: 01/04/2010 11:32
ViewersEverybody
Maintained byEditor
Hits615 Hits
Last updated on 02/05/2010 14:32
Homepage
CRC Checksum
MD5 Checksum