Inca Engineering Inc. Services

Tetra Tech INCA Services Project Description Downloads Green River Headworks Modifications
Details for Green River Headworks Modifications
PropertyValue
NameGreen River Headworks Modifications
Description

Tetra Tech INCA provided pre-bid and engineering during construction services to raise the height of the existing diversion dam, modify the intake structures, add a fish screen and fish ladder, and construct a fish sorting facility.

INCA’s designs for the fish passage facilities were coordinated with the new dam and intake, on the upstream end of the project, and with the fish trap and sort facility on the downstream end of the project. Subsequent work involved review of the construction documents to determine if revisions were necessary due to code changes or changes in component manufacturers and requirements for engineering during construction.

FilenameGreenRiverHeadworksModifications.pdf
Filesize137.65 kB
Filetypepdf (Mime Type: application/pdf)
CreatorINCA
Created On: 01/04/2010 11:59
ViewersEverybody
Maintained byEditor
Hits473 Hits
Last updated on 02/04/2010 19:15
Homepage
CRC Checksum
MD5 Checksum