
| Property | Value |
| Name | Green River Headworks Modifications |
| Description | Tetra Tech INCA provided pre-bid and engineering during construction services to raise the height of the existing diversion dam, modify the intake structures, add a fish screen and fish ladder, and construct a fish sorting facility. |
| Filename | GreenRiverHeadworksModifications.pdf |
| Filesize | 137.65 kB |
| Filetype | pdf (Mime Type: application/pdf) |
| Creator | INCA |
| Created On: | 01/04/2010 11:59 |
| Viewers | Everybody |
| Maintained by | Editor |
| Hits | 473 Hits |
| Last updated on | 02/04/2010 19:15 |
| Homepage | |
| CRC Checksum | |
| MD5 Checksum |