Details for Bayou Segnette Pump Station and Company Canal
PropertyValue
NameBayou Segnette Pump Station and Company Canal
Description

Tetra Tech INCA was selected to design flood gates at the Old Bayou Segnette Pump Station and at the entrance to Company Canal. Initially, approximately 1,200 feet of structural flood wall was designed to protect the distance between the two gates.

 

At Old Bayou Segnette Pump Station, INCA designed a 30-foot-wide vertical lift gate. The gate will be powered electrically and controlled from three operating stations and has a manual back up lowering system.

 

At Company Canal, INCA designed a barge gate with a 45 feet clear opening, sill elevation at -8.00 and still water level at elevation 9.00. The barge is approximately 15 feet wide and 47 feet long. During storm threats, the barge will be floated into the closed position from the stored position via a powered windlass and then ballasted down for potential flood events.

FilenameBayouSegnettePumpStationCompanyCanal.pdf
Filesize179.53 kB
Filetypepdf (Mime Type: application/pdf)
CreatorINCA
Created On: 01/04/2010 12:52
ViewersEverybody
Maintained byEditor
Hits566 Hits
Last updated on 02/04/2010 17:13
Homepage
CRC Checksum
MD5 Checksum