
| Property | Value |
| Name | I-405 Canyon Park Freeway Station |
| Description | Tetra Tech INCA was the prime consultant for the feasibility study preliminary / final engineering and environmental documentation for this transit flyer stop on southbound I-405 at SR 527. The preliminary / final engineering and environmental documentation included WSDOT design documentation, field survey and base mapping, architectural / aesthetic resolution with current I-405 aesthetics and the future vision of the I-405 corridor, stormwater report and Traffic Impact Analysis Report preparation, roadway design, construction estimate development, construction schedule, final contract documents, and the management of subconsultants for structural design, architectural design, geotechnical engineering, landscaping, analysis, and environmental permitting. |
| Filename | I405CanyonParkFreewayStation.pdf |
| Filesize | 100.85 kB |
| Filetype | pdf (Mime Type: application/pdf) |
| Creator | INCA |
| Created On: | 01/05/2010 09:43 |
| Viewers | Everybody |
| Maintained by | Editor |
| Hits | 487 Hits |
| Last updated on | 02/04/2010 19:29 |
| Homepage | |
| CRC Checksum | |
| MD5 Checksum |