
| Property | Value |
| Name | Terminal 4 Fender Study |
| Description | The existing fendering system at the Port of Tacoma’s Terminal 4 was not adequate to handle the size and class of ship currently operating there. Consequently, the Port hired Tetra Tech INCA to study potential fender alternatives that would provide outstanding pier fender protection without interrupting service. |
| Filename | Terminal4FenderStudy.pdf |
| Filesize | 130 kB |
| Filetype | pdf (Mime Type: application/pdf) |
| Creator | INCA |
| Created On: | 01/05/2010 13:51 |
| Viewers | Everybody |
| Maintained by | Editor |
| Hits | 411 Hits |
| Last updated on | 02/05/2010 14:18 |
| Homepage | |
| CRC Checksum | |
| MD5 Checksum |