Inca Engineering Inc. Services

Details for Terminal 4 Fender Study
PropertyValue
NameTerminal 4 Fender Study
Description

The existing fendering system at the Port of Tacoma’s Terminal 4 was not adequate to handle the size and class of ship currently operating there. Consequently, the Port hired Tetra Tech INCA to study potential fender alternatives that would provide outstanding pier fender protection without interrupting service.

The selected fender pile system consists of modules spaced 80-feet on center. Each fender module has two steel pipe piles driven vertically to position and support a prefabricated fender panel. This fender panel has two steel pipe sleeves which slide over the fender piles and two additional steel pipes oriented vertically.

FilenameTerminal4FenderStudy.pdf
Filesize130 kB
Filetypepdf (Mime Type: application/pdf)
CreatorINCA
Created On: 01/05/2010 13:51
ViewersEverybody
Maintained byEditor
Hits411 Hits
Last updated on 02/05/2010 14:18
Homepage
CRC Checksum
MD5 Checksum