Inca Engineering Inc. Services

Tetra Tech INCA Services Project Description Downloads SR 526 and I-5 Interchange and Flyover Ramp
Details for SR 526 and I-5 Interchange and Flyover Ramp
PropertyValue
NameSR 526 and I-5 Interchange and Flyover Ramp
Description

The City of Everett, in a partnership with Boeing, WSDOT, and FHWA, undertook this project to accommodate the increase in traffic with the opening of Boeing’s 777 Plant. Tetra Tech INCA provided scoping, conceptual design, alternatives analyses, preliminary and final plans, specifications, cost estimates, and construction services for major interchange modifications. This section of SR 526 is a fully-directional, four-level interchange, over a mile in length. Proximity to the Everett Mall required year-around traffic flow during construction. The bridge is a five span, 1,055-foot long steel plate girder bridge, which is curved at a 700-foot radius and is designed in accordance with AASHTO’s Guide Specifications for Horizontally Curved Highway Bridges.

The bridge is a 5-span, 1,055-foot long steel plate girder bridge curved on a 700-foot radius. Supports for the structure consist of compound-radiused concrete columns atop 10-foot diameter drilled concrete shafts. The bridge deck and traffic barrier are composed of 5,000 psi concrete with a width of 25 feet between barriers.
 

FilenameSR526 and I5 Interchange and Flyover Ramp.pdf
Filesize122.08 kB
Filetypepdf (Mime Type: application/pdf)
CreatorINCA
Created On: 01/06/2010 09:35
ViewersEverybody
Maintained byEditor
Hits485 Hits
Last updated on 02/05/2010 14:05
Homepage
CRC Checksum
MD5 Checksum