Inca Engineering Inc. Services

Tetra Tech INCA Services Project Description Downloads P&L Railroad Bridge Relocation
Details for P&L Railroad Bridge Relocation
PropertyValue
NameP&L Railroad Bridge Relocation
Description

The P&L Railroad bridge relocation allows for construction of a new longer lock at Kentucky Lock and Dam at the site of the existing bridge. The new lock and bridge will make river navigation in the future easier for barges.

Tetra Tech INCA provided design and construction services for the bridge relocation. INCA’s work consisted of providing foundation design for a 3,500-foot long, 15-span bridge structure spanning the Tennessee River. INCA’s services on this project included:

Work included the design of 11 piers, each of which included 4 drilled shafts, a 34-foot diameter shaft cap, a 10-foot diameter column, and a column cap. Drilled shaft lengths ranged from 75 to 105 feet, and are embedded in bedrock with rock socket depths varying from 25 to 42 feet. Pier heights (above the shafts) range from 72 to 82 feet.

FilenameP-L Railroad Bridge Relocation.pdf
Filesize157.38 kB
Filetypepdf (Mime Type: application/pdf)
CreatorINCA
Created On: 01/06/2010 10:00
ViewersEverybody
Maintained byEditor
Hits619 Hits
Last updated on 02/05/2010 13:45
Homepage
CRC Checksum
MD5 Checksum