Inca Engineering Inc. Services

Tetra Tech INCA Services Project Description Downloads Tieton Dam Hydroelectric Facility
Details for Tieton Dam Hydroelectric Facility
PropertyValue
NameTieton Dam Hydroelectric Facility
Description

Tetra Tech INCA performed detailed designs and prepared construction drawings and specifications for Tieton Hydropower, LLC for this two-unit, 18 MW hydroelectric power plant located on the outlet works of the existing US Bureau of Reclamation (USBR) Tieton Dam. INCA reviewed all contractors’ manufacturer drawings and provided equipment inspections at sites within the US and China. INCA provided construction monitoring and commissioning and testing assistance.

The project includes the installation of ultrasonic flow meters on the existing penstocks and the relocation of two existing 6-foot diameter jet flow valves and integration of the jet flow valve controls with the turbine governors so that the Jet flow valves can be operated to regulate the flow releases when one or both units are down for maintenance or when the required releases are outside the range of flows that can be passed through the units. INCA’s work included structural analysis and several generation studies for selection, sizing and optimization of energy production.

FilenameTietonDamHydroelectricProject.pdf
Filesize151.74 kB
Filetypepdf (Mime Type: application/pdf)
CreatorINCA
Created On: 01/07/2010 11:04
ViewersEverybody
Maintained byEditor
Hits794 Hits
Last updated on 02/05/2010 14:27
Homepage
CRC Checksum
MD5 Checksum