
| Property | Value |
| Name | Tieton Dam Hydroelectric Facility |
| Description | Tetra Tech INCA performed detailed designs and prepared construction drawings and specifications for Tieton Hydropower, LLC for this two-unit, 18 MW hydroelectric power plant located on the outlet works of the existing US Bureau of Reclamation (USBR) Tieton Dam. INCA reviewed all contractors’ manufacturer drawings and provided equipment inspections at sites within the US and China. INCA provided construction monitoring and commissioning and testing assistance. |
| Filename | TietonDamHydroelectricProject.pdf |
| Filesize | 151.74 kB |
| Filetype | pdf (Mime Type: application/pdf) |
| Creator | INCA |
| Created On: | 01/07/2010 11:04 |
| Viewers | Everybody |
| Maintained by | Editor |
| Hits | 794 Hits |
| Last updated on | 02/05/2010 14:27 |
| Homepage | |
| CRC Checksum | |
| MD5 Checksum |