Inca Engineering Inc. Services

Tetra Tech INCA Services Project Description Downloads Swift No. 2 Hydroelectric Project
Details for Swift No. 2 Hydroelectric Project
PropertyValue
NameSwift No. 2 Hydroelectric Project
Description

Tetra Tech INCA performed design computations, finite element stress analyses, and detail design for Swift No. 2 surge arresting pipeline and structures.

 

The effort comprised:

  • One 15’10” square to round intake transition
  • Two 15’10” diameter bends
  • One 15’10” diameter pipeline (penstock) on a 19 degree slope
  • One 15’10” x 11’4” bifurcation
  • Two 11’4” diameter pipelines each with a bend and a 11’4” x 6’0” reducer


The design and analyses included the design of all site handling, supports and erection devices, internal temporary stulling rings to resist concrete embedment loads, as well as hold down ties / supports for concreting.

FilenameSwift2HydroelectricProject.pdf
Filesize374.36 kB
Filetypepdf (Mime Type: application/pdf)
CreatorINCA
Created On: 01/07/2010 13:17
ViewersEverybody
Maintained byEditor
Hits493 Hits
Last updated on 02/05/2010 14:13
Homepage
CRC Checksum
MD5 Checksum