Inca Engineering Inc. Services

Tetra Tech INCA Services Project Description Downloads Chickamauga Lock Replacement Upstream - Downstream Approach Walls
Details for Chickamauga Lock Replacement Upstream - Downstream Approach Walls
PropertyValue
NameChickamauga Lock Replacement Upstream - Downstream Approach Walls
Description

Tetra Tech INCA designed and evaluated multiple approach wall alternatives, including fixed, floating, and float-in designs. An alternative was selected and INCA is now moving forward with final design elements for approach walls for the lock. The walls are designed for anticipated environmental loads, barge impact, earthquake, and construction loads. Nose Piers are provided at the end of the approach walls to protect them from head-on barge collisions.

FilenameChickamauga Lock Replacement Approach Walls.pdf
Filesize106.17 kB
Filetypepdf (Mime Type: application/pdf)
CreatorINCA
Created On: 01/20/2010 10:28
ViewersEverybody
Maintained byEditor
Hits493 Hits
Last updated on 02/04/2010 17:36
Homepage
CRC Checksum
MD5 Checksum