Inca Engineering Inc. Hydropower

Tetra Tech INCA Services Hydropower Swift No. 2 Hydroelectric Project
Swift No. 2 Hydroelectric Project E-mail


Swift No. 2 HydroelectricTetra Tech INCA performed design computations, finite element stress analyses, and detail design for Swift No. 2 surge arresting pipeline and structures.

 

The effort comprised:

  • One 15’10” square to round intake transition
  • Two 15’10” diameter bends
  • One 15’10” diameter pipeline (penstock) on a 19 degree slope
  • One 15’10” x 11’4” bifurcation
  • Two 11’4” diameter pipelines each with a bend and a 11’4” x 6’0” reducer


The design and analyses included the design of all site handling, supports and erection devices, internal temporary stulling rings to resist concrete embedment loads, as well as hold down ties / supports for concreting.

 