Inca Engineering Inc. Civil Engineering

Kirkland Transit Center E-mail


Kirkland Transit CenterTetra Tech INCA conducted environmental studies; prepared environmental documentation, developed a permit matrix; prepared a traffic study and a hydraulics report. Environmental work included the development of an environmental tracking matrix, SEPA checklist and a noise analysis. A hydraulics report was developed with a focus on Low Impact Development opportunities.

The project accommodated storm drainage systems, landscaping, lighting, and adjacent traffic signal/roadway improvements, which were added as environmental mitigation requirements during the environmental process.
 

icon Kirkland Transit Center 2 (125.25 kB)



Add this page to your favorite Social Networking websites
Reddit! Del.icio.us! Mixx! Google! Live! Facebook! Technorati! StumbleUpon! LinkedIn! TwitThis