Inca Engineering Inc. Civil Engineering

LINK Light Rail S700 Aerial Structures E-mail


INCA Engineers provided final design services for LINK Light Rail Section S700: International District to Royal Brougham to the West Beacon Hill Tunnel. INCA was responsible for structural design services for this light rail alignment, including aerial structures, transition structures, and embedded and direct fixation track slabs. This $55-million project was the first section of Sound Transit’s LINK light rail corridor to go to final design. The structural effort included: Aerial structures and retaining walls including connections to the maintenance facility; drilled shaft foundations in poor soil conditions with large seismic forces and a stringent two-level design criteria; and complex track work loads on the aerial structure (numerous turnouts and complex geometry). INCA provided engineering support during construction, including shop drawing reviews, RFIs, and on-call structural inspections.

 

LINK Light Rail S700 Aerial Structures

 

 icon LINK Light Rail S700 Aerial Structures (134.34 kB)



Add this page to your favorite Social Networking websites
Reddit! Del.icio.us! Mixx! Google! Live! Facebook! Technorati! StumbleUpon! LinkedIn! TwitThis