Lynnwood Transit Center, Park-and-Ride Lot |
|
|
INCA led a multi-disciplined architectural and engineering team in the site selection, environmental analysis, and design of the new Lynnwood Transit Center for Sound Transit. The new expanded facility includes 20 bus bays, passenger loading zones with shelters, a customer service center, and 300 additional parking stalls.
The project was developed in phases: for the first phase of this project, INCA was responsible for site selection and planning, preliminary engineering, and NEPA/SEPA environmental documentation for the proposed transit center, park-and-ride enhancements, and HOV direct access to I-5, which included a freeway flyer alternative. For the second phase, INCA was responsible for design mapping and preparing plans, specifications, and estimates (PS&E) for the transit center and park-and-ride improvements.
INCA provided design support and shop drawing review for Sound Transit during construction.